Awa Manneh — Behind Schedule (Can I Get A Witness) tekst piosenki i tłumaczenie

Strona zawiera teksty i polskie tłumaczenie piosenki "Behind Schedule (Can I Get A Witness)", wykonawca: Awa Manneh.

Tekst piosenki

Can I Get A Witness
I’ve Been Doing This Since Way Back
Can I Get A Witness
Are We Not Always On The Wrong Track
Can I Get A Witness
To Testify That You And I Are Through
Now Love’s Been on The Low Low I’ve Got Some Catching Up To Do
(So Me Say)
Baby It’s You Taking Up Time Leaving Me Behind Schedule
Now I’ve Got Some Catching Up To Do
It’s You Taking Up My Time
Leaving Me Behind Schedule
Now I’ve Got Some Catching Up To Do
Can I Get A Witness
I’m No Rookie In The Game Of Love
Can I Get A Witness
Playing Has Been Mostly With You
Can I Get A Witness
To Testify I Feel So Much Better Now
Now Love’s Been In The Low Low I’ve Got Some Catching Up To Do
(So Me Say)
Wanna Testify Everything’s In Order
Wanna Spread The Word Right Across The Border
Wanna Tell You That Everything Is Quite Allright
Letting Go Of You Is Gonna Make Me Wanna Sleep All Night

Tłumaczenie tekstu piosenki

Mogę Mieć Świadka?
Robię to od dawna.
Mogę Mieć Świadka?
Czy Nie Zawsze Jesteśmy Na Złej Drodze?
Mogę Mieć Świadka?
Zeznawać, Że Między Nami Koniec.
* Now Love 's Been on the Low Low I' ve Got Some Catching Up to Do *
(So Me Say)
Baby It ' s You Taking Up Time Leaving Me Behind
Teraz muszę nadrobić zaległości.
To Ty zajmujesz mój czas.
/ Align = "Left" / Linear
Teraz muszę nadrobić zaległości.
Mogę Mieć Świadka?
I ' M No Rookie In The Game of Love
Mogę Mieć Świadka?
Grałem Głównie Z Tobą.
Mogę Mieć Świadka?
Teraz Czuję Się O Wiele Lepiej.
Teraz Miłość jest w cieniu, Low I ' ve Got Some Catching Up to Do
(So Me Say)
Chcesz zeznawać, wszystko jest w porządku.
/ Align = "Left" /
Chcę Ci Powiedzieć, Że Wszystko Jest W Porządku.
"Letting Go Of You Is Gonna Make Me Wanna Sleep All Night"